It will take some time to get used to, but the ACC is now Scotiabank Arena. $800 million is a lot of money for naming rights.
I came across this blog which linked to the actual drawings for the changes. The most interesting thing for me was that the very large screen is about to get even bigger. It is currently 30' x 50' and it will be upgraded to 40' x 78'
Overall I think MLSE has done a decent job of keeping the building fresh even as it is now more than 20 years old.
Blog With Info
Architectural Drawings - New Screen
I came across this blog which linked to the actual drawings for the changes. The most interesting thing for me was that the very large screen is about to get even bigger. It is currently 30' x 50' and it will be upgraded to 40' x 78'
Overall I think MLSE has done a decent job of keeping the building fresh even as it is now more than 20 years old.
Blog With Info
Architectural Drawings - New Screen